Canopies in Berkshire

Streetspace has installed a wide range of canopies across Berkshire for schools, colleges and businesses.

Our canopy installations throughout the Berkshire area have included outdoor seated dining spaces, breakout areas, covered walkways as well as covered sports areas. Canopies from Streetspace are permanent structures and can be specified as steel or engineered timber frame with a range of tensile fabric and polycarbonate roof coverings. To provide additional protection from the elements canopy structures can also be enclosed using either toughened glass walling, aluminium curtain walling or solid polycarbonate vertical cladding. 

Our ZONE glazed buildings offer unrivalled cost efficiency, combining the technical performance of traditional construction with unique design flexibility and quick install times. Zone glazed buildings are perfect for transforming underutilised areas into highly functional and vibrant new dining and social spaces.

Please see below for just some of our canopy installations completed across Berkshire.

Don’t hesitate to get in contact with our knowledgeable team who will be able to assist with selecting the best canopy structure to meet your requirements. 

request a quote

Alternatively, try our online tool to get an estimated price for your preferred canopy.

Go to online estimator

Introduction

Canopy in Reading School, Berkshire

Reading Blue Coat School

Scope

  • TRITON Maxx Canopy
  • CENTAUR ST Cycle Stand

Location Reading, Berkshire

Reading Blue Coat School, an independent day school for boys founded in 1646, moved to the magnificent Holme Park estate in Sonning-on-Thames, Berkshire in 1947. Over the last 15 years the school have invested heavily in their facilities and now boast a portfolio that is the envy of many similar establishment…

read full case study here

St Barholomew’s School

Scope

  • CENTAUR CS cycle shelter
  • CENTAUR ST cycle stands

Location Newbury, Berkshire

As part of the UK government-led Building Schools for the Future programme, West Berkshire Council commissioned a complete new school to enable St Bartholomew’s School to consolidate its operations into a single site. The new buildings were completed in November 2010, with the demolition of old school buildings and external landscaping completed ready for the new school year in September 2011…

Cycle Shelter in Newbury School, Berkshire
read full case study here

Intro

All our canopy and walkway structures are designed in house using the latest 3D CAD technology from survey to manufacture, which ensures our project teams can accommodate challenging site constraints or particular design features with ease.